Kristiansand access bridge

In order to enable the construction of a pipeline tunnel, but also to ensure the accessibility of several offices, a temporary bridge over the sheet pile wall pit was necessary. Our customer TT Anlegg chose the bridge system JSB-2 because this system could be installed quickly and because this bridge only needs to be put into use for 6 months.

The installation date was planned for April 26, 2022 and went without any problems in close cooperation with the customer.

Podziel się na:

Szczegóły projektu

Rozwiązanie
Most blachownicowy
Typ
JSB
total length
27 m
Długość sekcji
13,5 m
Road width
5 m
Wysokość pokładu wraz z podparciem
1,1 m
Warstwa wierzchnia
Anti skid 2/3 mm
Weight
69 tons
Design load
Loadcase 4-6, Bk 10/60 boggilast
Client
TT Anlegg
Most blachownicowy